posted
Hi, in the rules put this (Center consoles must not interfere with the “String Test”. Competitors may “notch” their consoles or make the console easily removable to comply with this requirement).
But nobody have it good, Can I join the console with the wall of load? Or I have to do the separation for the Spring Test.
-------------------- "El SPL es muy Duro"
-Life begins after 175 db- (2.1 dB's over the goal)
posted
The console may not be permanently attached to the wall.
Build the console so it finishes near the wall.
The gap can be filled after the string test is done.
-------------------- Ben ----- www.EastCoastChoons.co.uk UK SS 1-2 NW Record Holder Team UK - Team ECC - Team RE - Team DD Posts: 2972 | From: Deepest Darkest Norfolk | Registered: Aug 2002
| IP: Logged |